6 Results
-
ASU Desert Financial Arena – (read more)
The Arizona State University (ASU) Desert Financial Arena project used a prefabricated power distribution center to modernize electrical infrastructure with minimal disruption and reduced on-site labor.
-
ASU LOT 8 – (read more)
EIG Modular delivered a prefabricated Power Distribution Center (PDC) that supported ASU’s campus expansion.
-
Cepheid Lodi Manufacturing Expansion – (read more)
As the electrical contractor, we played a crucial role in constructing a new two-story building on a 7-acre site, which spans a 174,145-square-foot building area. This facility is designed to manufacture quick-result test kits for various infectious diseases, including COVID-19 tests.
-
Rooftop renewables for a financial client – (read more)
Rooftop PV installation consisting of five individual buildings.
-
Merrill Farms - Broom & Jacks Sites – (read more)
Two fixed-tilt ground mount Photovoltaic (PV) systems were built at active agricultural farms.
-
Battery Energy Storage System (BESS) – (read more)
As the electrical contractor, EIG managed the installation of the new battery storage system, Battery Energy Storage System (BESS), at the Orlando Utilities Commission (OUC) St. Cloud Substation.